Decennial Liability and FIDIC
Articles 651 to 654, what the Court of Cassation has held, and why no FIDIC clause can cap it
November 20269 min read
A construction contract usually ends with a taking-over certificate, then a defects notification period, then a performance certificate. Many contractors assume their liability ends there. The Egyptian Civil Code keeps architects and contractors liable for ten years after handover, and no contract can remove or reduce that.12 This article sets out the text, what the Court of Cassation has held, how it meets the FIDIC clauses, and what the insurance does not cover.
The Text
Article 651, in its three paragraphs:
«يضمن المهندس المعماري والمقاول متضامنين ما يحدث خلال عشر سنوات من تهدم كلي أو جزئي فيما شيدوه من مبان أو أقاموه من منشآت ثابتة أخرى...»The architect and the contractor are jointly liable for any total or partial collapse, within ten years, of the buildings or other fixed structures they built, even if the collapse comes from a defect in the ground itself, or the employer approved the defective works, unless the parties intended the structures to last less than ten years.
«ويشمل الضمان المنصوص عليه في الفقرة السابقة ما يوجد في المباني والمنشآت من عيوب يترتب عليها تهديد متانة البناء وسلامته»The liability also covers defects that threaten the building's stability and safety.
«وتبدأ مدة السنوات العشر من وقت تسلم العمل»The ten years run from handover of the work.
The article adds that it does not apply to the contractor's recourse against subcontractors. Article 652 limits an architect who only produced the design, without being engaged to supervise, to design defects. Article 653 makes any term meant to exclude or limit the liability void: «يكون باطلا كل شرط يقصد به إعفاء المهندس المعماري والمقاول من الضمان أو الحد منه»Article 654 bars the claim three years after the collapse or the discovery of the defect: «تسقط دعاوى الضمان المتقدمة بانقضاء ثلاث سنوات من وقت حصول التهدم أو انكشاف العيب»
The text covers buildings and «other fixed structures», such as bridges, dams and tunnels. Defects that do not threaten stability and safety, such as paint and tiling, fall outside it and are left to the ordinary warranty.
What the Court of Cassation Has Held
The rulings below are as published in the collections listed in the sources.3
- Fault is presumed. The employer does not have to prove the contractor's fault. The contractor escapes the liability only by showing that it built to the design and the rules of the trade and that the defect comes from an outside cause. Where the defect lies in the design alone, the designer answers for it (Appeal 1847 of judicial year 59, session of 18 November 1993).
- The liability is contractual. An architect who had no works contract with the employer is not bound by it (, session of 21 May 1975).
- A contractor building someone else's design. It answers for a design error only if it knew of the error and went ahead, or the error was obvious (, session of 21 January 1965).
- The three years. They run from discovery of the defect, without waiting for it to worsen (, session of 26 May 1994). The filing of an evidence-preservation action has been taken as the date of discovery (, session of 31 May 1973).
When the Ten Years Start
The text says the period runs from handover of the work, and does not distinguish provisional from final handover. In a 2017 ruling the period was counted from final handover: handover on 15 October 1985, collapse on 1 January 1995, so the collapse fell within the period and the claim succeeded (, session of 26 January 2017). Article 655 treats an employer who refuses handover without lawful reason, after formal notice, as having taken it.
A FIDIC contract has two events that could correspond to handover: the Taking-Over Certificate at the end of construction, and the Performance Certificate at the end of the Defects Notification Period, which clause 11.9 says is the only certificate that constitutes acceptance of the Works. We found no published ruling deciding which one starts the ten years. So a contractor should plan its exposure from the later date, and an employer should count its deadlines from the earlier one.
Four Periods Not to Confuse
| Period | What it is | Runs from | Source |
|---|---|---|---|
| Ten years | The period within which the collapse must happen or the defect appear. | Handover of the work. | Article 651 |
| Three years | The time to bring the claim. | The collapse, or the discovery of the defect. | Article 654 |
| Defects Notification Period | A contractual duty to fix defects; not a substitute for decennial liability. | The completion date stated in the Taking-Over Certificate. | FIDIC Clause 11 |
| Two years for Plant | No liability for Plant defects after it, except where the law prohibits that. | Expiry of the Defects Notification Period. | Clause 11.10, 2017 editions |
So exposure can run to thirteen years after handover: a defect discovered at the very end of year ten, then three years to sue.
The FIDIC Clauses That Cannot Touch It
In the 1999 editions, Sub-Clause 17.6 caps the contractor's liability at the sum in the Particular Conditions, or else the Accepted Contract Amount, and the cap does not apply to fraud, deliberate default or reckless misconduct.4 In the 2017 editions, clause 1.15 sets the same cap and adds gross negligence to the exceptions.5 The 2022 amendments changed only the layout of clause 1.15, and did not touch clause 11.10.6
In Egypt neither clause can limit decennial liability, because Article 653 voids any term that limits it.78 The published regional reading of the 2017 editions is that decennial liability applies as a matter of law notwithstanding the clause, and that it is a mandatory rule the parties cannot contract out of.5
Clause 11.10 ends the contractor's liability for defects in Plant two years after the Defects Notification Period expires, «except if prohibited by law» or in cases of fraud, gross negligence, deliberate default or reckless misconduct. Where a defect falls within Article 651, Egyptian law prohibits it. That is our reading of the two texts together.
Design and Build, and Subcontractors
Article 652 protects an architect who designed but did not supervise. It does not protect the contractor under the Yellow and Silver Books, which carries design and construction together. The cap that clause 17.4 of the 2017 editions places on the design indemnity does not reach decennial liability either, for the same reason: Article 653.
Decennial liability does not flow down to subcontractors by itself: Article 651 leaves the contractor's recourse against them outside its scope, so the contractor recovers from them under the general rules. The main contractor stays liable to the employer for subcontracted work (Article 661). So write an express warranty of the same length into every subcontract, with insurance behind it.
What the Insurance Covers, and What It Does Not
Article 46 of the Building Law (Law 119 of 2008) bars any permit or start of work without an insurance policy for works worth EGP 1 million or more, buildings of four floors or more, and any vertical extension. The policy covers the civil liability of the engineers and contractors to third parties for total or partial collapse, during construction and throughout the Article 651 period. The insurer's limit is EGP 2 million per event and EGP 100,000 per person. If the cover lapses, the owner must stop the works (Article 47).9
The owner takes out the policy, but the beneficiaries are third parties, not the owner. So the employer's own loss in its building is not covered by it, and its limit is nowhere near the value of a large project. Contractors' all-risks and professional indemnity policies generally do not cover decennial liability either.10 An employer that wants cover for its own loss should look at inherent defects insurance, which Saudi Arabia has required on non-government projects since 2020, with a technical inspection service.11
Across the Region
| Country | Text | Period | Note |
|---|---|---|---|
| Egypt | Civil Code, Articles 651 to 654 | Ten years from handover; three to sue | Any term excluding or limiting it is void. |
| UAE | New Civil Transactions Law (Federal Decree-Law 25 of 2025, in force 1 June 2026), Article 821 onwards | Ten years12 | Substantively unchanged. An engineer engaged only to supervise is now jointly liable (Article 822(2))13. |
| Qatar | Civil Code, Article 711 onwards | Ten years; three to sue | Exclusion clauses are void (Article 715).14 |
| Saudi Arabia | No provision in the Civil Transactions Law. Building Code implementing regulations, Article 29 | Ten years from the occupancy certificate | Mandatory inherent defects insurance under Cabinet Resolution 509, in force from 2 May 2020.1516 |
| France | Civil Code, Article 1792 onwards | Ten years | The origin of the idea. Also covers defects that make the work unfit for its purpose. |
A Checklist for the Contract and the Site
- Say in clause 1.15 (or 17.6) that the cap and exclusions do not apply to liability under Articles 651 to 654. Article 653 voids them anyway; saying so avoids the argument.
- Keep the dates of the Taking-Over Certificate and the Performance Certificate, and any record of final handover.
- On design-and-build contracts, get warranties and professional indemnity cover from the designers that last the full ten years.
- In every subcontract, write an express warranty of the same length; decennial liability does not pass down by itself.
- Check the Article 46 policy and its limits, and decide whether the employer needs inherent defects cover for its own loss.
- Keep drawings, minutes and test reports for at least thirteen years after handover. That is our inference from the two periods together.
- When a defect appears, count the three years from that day. Waiting for it to get worse can cost you the claim.
Why a General Model Gets This Wrong
Most of what is written in English about construction contracts talks about defects notification periods and English limitation periods. Ask a general model “when does a contractor's liability end?” and the most likely answer in its training text is: when the defects notification period ends, subject to the cap. If it does recall decennial liability, it may give the French version, which is wider than the Egyptian text.
In Bayan Clause Intelligence, the FIDIC track flags any wording in clauses 1.15, 11.10 and 17.4, or in the Particular Conditions, that appears to limit it.
Checked against the sources below on 20 November 2026. Ruling references are as published in the collections cited. This article is general information, not legal advice.
To view the sources, sign in to Bayan Index.